Design, supply and installation of acoustic generator enclosures and integrated fuel systems for a new data centre hall, delivering N+1 standby power for critical IT load.
The scope covered enclosure engineering, fuel storage and transfer, controls integration and full commissioning, with works staged around a live, operating facility.










