Few buildings depend on reliable power as much as hospitals. Operating theatres, intensive care, life support, lighting, communications and medication storage all rely on electricity. When mains power fails, standby generators have to take over quickly and keep running.

Understand the critical loads

Hospital electrical systems separate loads by how critical they are. Some services must be restored within seconds, while others can tolerate a short delay. Mapping these loads and their priorities is the starting point for sizing generators, designing changeover arrangements and deciding where UPS systems are needed.

In Australia, emergency power supplies in hospitals are covered by AS/NZS 3009, alongside the general wiring rules in AS/NZS 3000 and any health department requirements. Designers and installers need to be across the obligations that apply to each facility.

Changeover speed and reliability

The time between mains failure and generator power reaching critical areas matters. Controls, transfer switching and generator start-up all need to work reliably, every time. Redundancy in generators and switchgear is common, so a single fault doesn’t leave critical areas without power.

Noise and location

Hospitals are occupied around the clock and often sit close to homes. Generator location, acoustic enclosures and exhaust design all help keep testing and outage running from disturbing patients, staff and neighbours.

Fuel for extended outages

Hospitals may need to run on generator power for extended periods during major events. Fuel storage, refuelling arrangements and fuel quality management should be planned around realistic worst-case scenarios.

Testing and maintenance

Regular testing under load, planned maintenance and good records are essential. Testing also needs to be scheduled and managed so it doesn’t disrupt clinical services.

Plan for change

Hospitals grow and change constantly. Leaving room for extra capacity and future connections makes it far easier to support new wings, equipment and services without a major rebuild of the power system.

The takeaway

Hospital standby power has to be dependable, compliant and designed around patient care. Early collaboration between clinical stakeholders, engineers and the generator supplier leads to the best outcomes.

Keep reading.

More practical insights on standby power and mission critical infrastructure.

Power infrastructure for the load that can't drop.